arrow Back to All Projects arrow Back to All Projects
OUR SCOPE

The City of Overland Park’s 2026 Street Improvement Project brought pavement and infrastructure improvements to neighborhoods throughout the city, as well as the City Hall parking lot. Superior Bowen provided project management and performed the majority of the asphalt paving, patching, and milling for the project.

The work included removing and replacing approximately 100,000 linear feet of curb and gutter, more than 100,000 square feet of sidewalk and ramp construction, and 175 inlet repairs. Crews also milled more than 285,000 square yards of streets, placed more than 55,000 tons of asphalt patching, and resurfaced the streets with approximately 35,000 tons of asphalt.

Unique challenges

With work occurring in neighborhoods across Overland Park, maintaining safe access while minimizing disruptions for residents and the traveling public required careful planning. Superior Bowen coordinated six different subcontractors and sequenced their work to maintain safe travel and keep construction progressing efficiently across multiple locations.

stats

Curb & Gutter: ±99,000 LF
Sidewalk & Ramps: 100,000+ SF
Inlet Repairs: 214
Street Milling: 285,000+ SY
Asphalt Patching: 60,000+ Tons
Asphalt Surfacing: ±35,000 Tons

A Legacy Infrastructure Group Company | EST. 2000