OUR SCOPE

Superior Bowen completed roadway improvements throughout Independence as part of the FY26 GO Bond Overlay Project. The work included curb and sidewalk ramp replacement, pavement patching, milling, a two-inch asphalt overlay and final restriping.

Stats
  • 383, 610 SY of milling
  • 48,817 tons of asphalt paving
  • 4,687 LF of curb
  • 12,697 SF of sidewalk ramps